Wastewater/Activity/PacpInspection/1.0Jan 13, 2021, 07:55 AM
  • 05 0925_05 0924A_01132021_000901.mp4

Date
01/12/2021
W/O
865286
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00547
PipeID
P06157
Time
11:55 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8418
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_865286_TV05372_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0925
Downstream MH
05 0924A
Dir. of Survey
Downstream
Length Surveyed
323.6 ft.
Total Length
323.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 05 0925 to 05 0924A
MH: 05 0925MH: 05 0924Adownstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - DROP CONN @ MH 3 O'CLOCK/OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 05 0924A0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"82.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"188.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"249.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"322.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323 ft. MGO - General Observation - ROACHES @ MH323.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0924A323.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2DAGS
0MGOROACHES @ MH
323.6AMH05 0924A
82.5TFC
2SSS
133.7TFC
323.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
322.3SAP
2MGO45% MAG COAT
30.1TFC
0MGODROP CONN @ MH 3 O'CLOCK/OPEN
2SAP
249.6TFC
322.3DAGS
0AMH05 0924A
188.2TFC
323MGOROACHES @ MH
0MWL
0MWM
322.3SSS

Properties (7)

additional_info
630069011221202