Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2021, 06:10 AM
  • 05 0912_05 0911_01132021_222347.mp4

Date
01/13/2021
W/O
865286
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00547
PipeID
P06143
Time
10:10 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8419
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_865286_TV05372_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 0912
Downstream MH
05 0911
Dir. of Survey
Downstream
Length Surveyed
330.3 ft.
Total Length
330.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole 05 0912 to 05 0911
MH: 05 0912MH: 05 0911downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 09120 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 55% MAG COAT328.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish330.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0911

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2SAP
330.3AMH05 0911
0AMH05 0912
328.4SAP
2DAGS
0MWM
0MWL
328.4SSS
2SSS
328.4DAGS
2MGO55% MAG COAT

Properties (7)

additional_info
630069011321201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-13T22:10:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false