Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2021, 06:52 AM
  • 22 0440_22 0439_01042021_231111.mp4

Date
01/04/2021
W/O
865107
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00815
PipeID
P16777
Time
10:52 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8365
Sewer Name
22 LARK ELLEN TRUNK, SECTS 2&3
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_865107_TV22047_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0440
Downstream MH
22 0439
Dir. of Survey
Downstream
Length Surveyed
357.8 ft.
Total Length
357.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 22 0440 to 22 0439
MH: 22 0440MH: 22 0439downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04402.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COAT22.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"26.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"69.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"73.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"117.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"121.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"165.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"169.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"217.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"221 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"268.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"272.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"316.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"320.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"354.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish357.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0439

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.5 ft. - General Observation - MAG COAT

Observations (21)

DistanceCodeObservation
121.7TFC
316.7TFC
73.9TF
0MWL
26.3TFC
165.5TF
354.9SAP
2.4SAP
272.8TFC
22.4TFC
357.8AMH22 0439
268.8TFC
69.7TFC
169.8TFA
320.6TFC
0MWM
117.8TFC
221TFC
2.5MGOMAG COAT
217.3TF
0AMH22 0440

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-01-04T22:52:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false