Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2021, 09:26 AM
  • 22 1131_B 0720_01082021_013747.mp4

Date
01/08/2021
W/O
865130
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09395
Time
1:26 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8409
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_865130_TV22155_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
42 in.
Upstream MH
22 1131
Downstream MH
B 0720
Dir. of Survey
Downstream
Length Surveyed
154.5 ft.
Total Length
154.5 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
146
O&M Index
2
O&M Quick
2E00
O&M Rating
60
Overall Index
2
Overall Quick
Overall Rating
206
Pipe schematic from manhole 22 1131 to B 0720
MH: 22 1131MH: B 0720downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 8 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 11312 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start31.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish152.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish152.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish154.5 ft. AMH - Downstream Manhole, Survey Ends - B 0720154.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    154.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
0MWL
0MGOCONNECTION AT MH 8 O'CLOCK
80.3TFC
0MWM
31.9TFC
152.1DAGS
2SAP
129.3TFC
0AMH22 1131
154.5AMHB 0720
152.1SSS
2DAGS
152.1SAP
154.5MGOCOCKROACHES IN MANHOLE
10.2SSS

Properties (7)

additional_info
630069010721081
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-08T01:26:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false