Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2021, 05:58 AM
  • B 0703_B 0702_01072021_221200.mp4

Date
01/07/2021
W/O
865130
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09376
Time
9:58 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8409
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_865130_TV22155_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
54 in.
Upstream MH
B 0703
Downstream MH
B 0702
Dir. of Survey
Downstream
Length Surveyed
266.5 ft.
Total Length
266.5 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
163
Pipe schematic from manhole B 0703 to B 0702
MH: B 0703MH: B 0702downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07030 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT42.7 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"79.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"230.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"264.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish264.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish266.5 ft. AMH - Downstream Manhole, Survey Ends - B 0702266.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE266.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - COCKROACHES IN MANHOLE

    266.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
0MGOCONNECTION AT MH 6 O'CLOCK
2DAGS
264.9DAGS
266.5AMHB 0702
169.1TFA
2SAP
230.5TFA
0MWM
42.7TFA
2MGOMAG COATING THROUGHOUT
88.5TFA
266.5MGOCOCKROACHES IN MANHOLE
0AMHB 0703
266.5MGOCONNECTION AT MH 3 O'CLOCK
248.2TFA
79.1TFA
0MWL
264.9SAP

Properties (7)

additional_info
630069010721081
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-01-07T21:58:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false