Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 08:08 AM
  • B 0687_B 0686_01072021_001951.mp4

Date
01/07/2021
W/O
865130
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09357
Time
12:08 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8408
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_865130_TV22155_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
36 in.
Upstream MH
B 0687
Downstream MH
B 0686
Dir. of Survey
Downstream
Length Surveyed
440 ft.
Total Length
440 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
429
O&M Index
2
O&M Quick
2P00
O&M Rating
174
Overall Index
2
Overall Quick
Overall Rating
603
Pipe schematic from manhole B 0687 to B 0686
MH: B 0687MH: B 0686downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - B 06870 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start17.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start82.6 ft. MGO - General Observation - MAG COATING THROUGHOUT437.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish437.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish437.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish440 ft. AMH - Downstream Manhole, Survey Ends - B 0686440 ft. MGO - General Observation - COCKROACHES IN MANHOLE440 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    17.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    82.6 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - COCKROACHES IN MANHOLE

    440 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
437.9SAP
0MWL
0MGOCOCKROACHES IN MANHOLE
0AMHB 0687
17.8SSS
437.9DAGS
82.6MGOMAG COATING THROUGHOUT
437.9SSS
440AMHB 0686
440MGOCOCKROACHES IN MANHOLE
2DAGS
0MWM
440MGOCONNECTION AT MH 3 O'CLOCK
3.2SAP

Properties (7)

additional_info
630069010621202
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-07T00:08:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false