Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2021, 07:34 AM
  • 22 0785_22 0784_01112021_235601.mp4

Date
01/11/2021
W/O
865110
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00824
PipeID
P17149
Time
11:34 PM
Certificate
U-115-06002794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8372
Sewer Name
22 RAMONA AVENUE TRUNK
City
LA VERNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_865110_TV22089_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0784
Downstream MH
22 0785
Dir. of Survey
Upstream
Length Surveyed
345.3 ft.
Total Length
345.3 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0784 to 22 0785
MH: 22 0784MH: 22 0785upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 07851.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish18.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"66.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"109.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"149.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"201.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"304.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start304.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"304.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish316.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start326.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start338.2 ft. MGO - General Observation - MAG COAT345.3 ft. AMH - Downstream Manhole, Survey Begins - 22 0784345.3 ft. MGO - General Observation - CONNECTION AT MH 3 & 9 O'CLOCK345.3 ft. MWL - Water Level, 20 %of cross sectional area345.3 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (5)

  • General Observation - MAG COAT

    7.1 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    28.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    41.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    235.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (18)

DistanceCodeObservation
19SAV
195.7TF
0AMH22 0784
41TF
344.1SSS
0MGOCONNECTION AT MH 3 & 9 O'CLOCK
28.4SSS
41.1SAP
0MWL
7.1MGOMAG COAT
278.8TF
326.8TF
345.3AMH22 0785
41SAV
144.2TF
235.9TB
344.1SAP
0MWM

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-01-11T23:34:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false