Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2021, 06:36 AM
  • 22 0781A_22 0781_01112021_225329.mp4

Date
01/11/2021
W/O
865110
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00824
PipeID
P17143
Time
10:36 PM
Certificate
U-115-06002794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8372
Sewer Name
22 RAMONA AVENUE TRUNK
City
LA VERNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_865110_TV22089_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0781A
Downstream MH
22 0781
Dir. of Survey
Downstream
Length Surveyed
187.1 ft.
Total Length
187.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0781A to 22 0781
MH: 22 0781AMH: 22 0781downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 0781A0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. MGO - General Observation - MAG COAT2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"18 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"78 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"82.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"114.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"118.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"184.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish184.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish187.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0781

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.7 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
14.1TFC
2.7SAP
0AMH22 0781A
78TFC
18TF
187.1AMH22 0781
0MGOCONNECTION AT MH 9 O'CLOCK
2.7MGOMAG COAT
0MWL
0MWM
184.2SAP
82.1TF
2.7SSS
184.2SSS
118.1TF
114.1TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-01-11T22:36:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false