Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2021, 08:11 AM
  • 22 0780A_22 0780_01122021_003036.mp4

Date
01/12/2021
W/O
865110
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00824
PipeID
P17141
Time
12:11 AM
Certificate
U-115-06002794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8372
Sewer Name
22 RAMONA AVENUE TRUNK
City
LA VERNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_865110_TV22089_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0780A
Downstream MH
22 0780
Dir. of Survey
Downstream
Length Surveyed
354.7 ft.
Total Length
354.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 22 0780A to 22 0780
MH: 22 0780AMH: 22 0780downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 0780A0 ft. MGO - General Observation - MAG COAT0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 8"116.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 8"120 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"122.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"191.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 8"255.2 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 8"267.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 8"310.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 8"330.1 ft. LR - Alignment Right, 20 %, Start352.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish352.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish352.7 ft. LR - Alignment Right, 20 %, Finish354.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0780354.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • General Observation - MAG COAT

    0 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    122.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Alignment Right, 20 %, Start

    330.1 ft. - Alignment Right, 20 %, Start

Observations (21)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
354.7AMH22 0780
0AMH22 0780A
330.1LR
255.2TF
122.2TB
27.3TFC
0MGOMAG COAT
2SAP
310.9TFC
352.7SAP
116.1TF
0MWM
0MWL
354.7MGOCONNECTION AT MH 9 O'CLOCK
191.3TF
352.7SSS
120TFC
2SSS
352.7LR
267.2TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-01-12T00:11:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false