Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2021, 11:57 AM
  • 02 1887_02 1886_01112021_041331.mp4

Date
01/11/2021
W/O
865210
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01172
PipeID
P04251
Time
3:57 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8414
Sewer Name
02 DOUGLAS AVENUE RELOCATION TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_865210_TV02250_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1886
Downstream MH
02 1887
Dir. of Survey
Upstream
Length Surveyed
293.2 ft.
Total Length
293.2 ft.
Structural Index
3
Structural Quick
4D3K
Structural Rating
282
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
3
Overall Quick
Overall Rating
398
Pipe schematic from manhole 02 1886 to 02 1887
MH: 02 1886MH: 02 1887upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 18870 ft. MGO - General Observation - CONNECTION AT MH 1 O'CLOCK1.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish12.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"82.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"126 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start141.6 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES151.2 ft. FM - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES157.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"160.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.5 ft. FM - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES286.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"286.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start291.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start293.2 ft. MWM - Water Mark, 10 %of cross sectional area293.2 ft. AMH - Downstream Manhole, Survey Begins - 02 1886293.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK293.2 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

    69.7 ft. - Fracture Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

    142 ft. - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    151.6 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    167.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
0MWM
6.5SAP
265.7TFA
167.2FM
178TFA
151.6FL
0AMH02 1886
135.9TFA
291.8SAP
142FM
226TFA
69.7FM
291.8FM
132.6TFA
121TFA
0MGOCONNECTION AT MH 9 O'CLOCK
211.1TFA
280.9TFA
88TFA
293.2AMH02 1887
293.2MGOCONNECTION AT MH 1 O'CLOCK
2DAGS
0MWL
6.7TBA
291.8DAGS

Properties (7)

additional_info
630069011121004
custom_field_three
PROJECTING AGGREGATE/MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-01-11T03:57:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false