Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2021, 09:10 AM
  • 22 0276_22 0275_01122021_012959.mp4

Date
01/12/2021
W/O
864892
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16562
Time
1:10 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8373
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_864892_TV22015_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0276
Downstream MH
22 0275
Dir. of Survey
Downstream
Length Surveyed
330.9 ft.
Total Length
330.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0276 to 22 0275
MH: 22 0276MH: 22 0275downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02760 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start77 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"180.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"276 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"328.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK330.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK330.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0275

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
180.6TF
276TFC
328.5SAP
0MWM
330.9MGOCONNECTION AT MH 9 O'CLOCK
0AMH22 0276
0MWL
2MGOMAG COAT
2SAP
2SSS
328.5SSS
330.9MGOCONNECTION AT MH 9 O'CLOCK
330.9AMH22 0275
77TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-01-12T01:10:52-08:00
documentation
PRO PIPE
is_lateral_inspection
false