Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 11:18 AM
  • B 0698_B 0697_01072021_033008.mp4

Date
01/07/2021
W/O
864857
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09368
Time
3:18 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8407
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_864857_TV22069_DEC2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
54 in.
Upstream MH
B 0697
Downstream MH
B 0698
Dir. of Survey
Upstream
Length Surveyed
280.6 ft.
Total Length
280.6 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
123
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
233
Pipe schematic from manhole B 0697 to B 0698
MH: B 0697MH: B 0698upstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Ends - B 06980 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish48.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"64.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"164.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start231.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"261.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"278.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start278.6 ft. MGO - General Observation - MAG COATING THROUGHOUT280.6 ft. MWL - Water Level, 10 %of cross sectional area280.6 ft. AMH - Downstream Manhole, Survey Begins - B 0697280.6 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    75.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    280.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
49.1TFA
216.2TFC
277.6DAGS
0MWL
2DAGS
158.2TFC
115.9TFC
231.8TFC
280.6MGOCOCKROACHES IN MANHOLE
156TFA
277.6SAP
280.6AMHB 0698
0AMHB 0697
2MGOMAG COATING THROUGHOUT
19.1TB
0MWM
280.6MGOCONNECTION AT MH 9 O'CLOCK
75.1SAP

Properties (7)

additional_info
630069010621201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-07T03:18:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false