Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2021, 10:54 AM
  • H 0353_H 0352_01112021_025828.mp4

Date
01/11/2021
W/O
864840
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00176
PipeID
P10802
Time
2:54 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8413
Sewer Name
H JOINT OUTFALL H - UNIT 4 RELIEF
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Routine Assessment
Project
RFIR_WO_864840_TV02268_DEC2020
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
H 0352
Downstream MH
H 0353
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
5121
O&M Rating
7
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0352 to H 0353
MH: H 0352MH: H 0353upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.2 ft. AMH - Downstream Manhole, Survey Begins - H 03522 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. MWL - Water Level, 50 %of cross sectional area2 ft. MWM - Water Mark, 75 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

    2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

Observations (6)

DistanceCodeObservation
2DAGS
0AMHH 0352
0MGOCONNECTION AT MH 9 O'CLOCK
2MSAVIEW OF UPLEG OF D/S SIPHON.
0MWL
0MWM

Properties (7)

additional_info
630069011121003
custom_field_three
LIGHT GREASE/RFIR
custom_field_two
3
customer
1
datetime
2021-01-11T02:54:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false