Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 24, 2020, 07:00 PM
  • H 0475_H 0417A_11242020_111433.mp4

Date
11/24/2020
W/O
848810
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00177
PipeID
P27090
Time
11:00 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8222
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
BASSETT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_848810_TV15130_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0475
Downstream MH
H 0417A
Dir. of Survey
Downstream
Length Surveyed
206.6 ft.
Total Length
206.6 ft.
Structural Index
3
Structural Quick
3G2F
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole H 0475 to H 0417A
MH: H 0475MH: H 0417Adownstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04752 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT39.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start206.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish206.6 ft. AMH - Downstream Manhole, Survey Ends - H 0417A206.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    39.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWM
206.6SAP
0MWL
39.5SSS
2SAP
0AMHH 0475
206.6AMHH 0417A
2MGOMAG COAT
206.6SSS

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-24T11:00:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false