Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 30, 2020, 08:11 AM
  • 05 0296_05 0295_9302020_015729.mp4

Date
09/30/2020
W/O
0850188
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05504
Time
1:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1575
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
20200929MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
22 in.
Upstream MH
05 0296
Downstream MH
05 0295
Dir. of Survey
Downstream
Length Surveyed
328.9 ft.
Total Length
328.9 ft.
Structural Index
3
Structural Quick
3422
Structural Rating
16
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 05 0296 to 05 0295
MH: 05 0296MH: 05 0295downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 2:05AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE9.6 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE14.6 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG14.6 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG23.2 ft. MGO - General Observation - POSSIBLE OLD WHITE COATING ON PIPE73.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish117.9 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG117.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC117.9 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG117.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG328.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE328.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC328.9 ft. AMH - Downstream Manhole, Survey Ends - 2:35AM

Observation photos (8)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    9.6 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    14.6 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    14.6 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - POSSIBLE OLD WHITE COATING ON PIPE

    23.2 ft. - General Observation - POSSIBLE OLD WHITE COATING ON PIPE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    117.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

Observations (19)

DistanceCodeObservation
9.6SSSPEELING CONCRETE
0MGOConn. @ Mh, 3 O' Clock. Active
2DAGS
0AMH2:05AM
14.6SAPSEVERE AGG
117.9SAPSEVERE AGG
0MWL
0MWM
328.9AMH2:35AM
2SAVSEVERE AGG
328.4SSSBLISTERING PEELING CONCRETE
73.6DAGS
117.9SAVSEVERE AGG SPORATIC
14.6SAPSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
23.2MGOPOSSIBLE OLD WHITE COATING ON PIPE
117.9SAPSEVERE AGG
328.4SAVSEVERE AGG SPORATIC
117.9SAVSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-09-30T01:11:39-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false