Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2021, 05:39 AM
  • D 0111_D 0110_01072021_214718.mp4

Date
01/07/2021
W/O
864852
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10019
Time
9:39 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8452
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_864852_TV05171_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
51 in.
Upstream MH
D 0111
Downstream MH
D 0110
Dir. of Survey
Downstream
Length Surveyed
124.1 ft.
Total Length
124.1 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
120
O&M Index
2
O&M Quick
2D00
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
168
Pipe schematic from manhole D 0111 to D 0110
MH: D 0111MH: D 0110downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - D 01112 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - 65% MAG COAT2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start122 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish124.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish124.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish124.1 ft. AMH - Downstream Manhole, Survey Ends - D 0110

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (12)

DistanceCodeObservation
2DAGS
0MWM
0MWL
2.1MGO65% MAG COAT
124.1SSS
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
2.1SAP
122DAGS
124.1SAP
2.1SSS
124.1AMHD 0110
0AMHD 0111

Properties (7)

additional_info
630075010721081
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-07T21:39:15-08:00
documentation
PROPIPE
is_lateral_inspection
false