Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 08:40 AM
  • D 0236_D 0098_01072021_005202.mp4

Date
01/07/2021
W/O
864852
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10005
Time
12:40 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8350
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_864852_TV05171_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
57 in.
Upstream MH
D 0236
Downstream MH
D 0098
Dir. of Survey
Downstream
Length Surveyed
208.8 ft.
Total Length
208.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
205
Pipe schematic from manhole D 0236 to D 0098
MH: D 0236MH: D 0098downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 02360 ft. MWL - Water Level, 20 %of cross sectional area2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - 60% MAG COAT2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start208.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN208.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish208.8 ft. AMH - Downstream Manhole, Survey Ends - D 0098208.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MGOCONN @ MH 9 O'CLOCK/OPEN
2.3SSS
208.8MGOCONN @ MH 3 O'CLOCK/OPEN
0MWM
0AMHD 0236
2.3MGO60% MAG COAT
0MWL
208.8SAP
208.8SSS
2.3SAP
208.8AMHD 0098
208.8MGOCONN @ MH 9 O'CLOCK/OPEN

Properties (7)

additional_info
630075010621201
custom_field_three
AGGREGATE PROJECTING/SPALLING/
custom_field_two
2
customer
1
datetime
2021-01-07T00:40:01-08:00
documentation
PROPIPE
is_lateral_inspection
false