Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 30, 2020, 11:48 AM
  • 01 0650_01 0649_12302020_040533.mp4

Date
12/30/2020
W/O
864828
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00212
PipeID
P01149
Time
3:48 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8360
Sewer Name
01 MOUNTAIN VIEW-BELLE VERNON TRUNK
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_864828_TV01110_DEC2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0650
Downstream MH
01 0649
Dir. of Survey
Downstream
Length Surveyed
372.9 ft.
Total Length
372.9 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
210
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
3
Overall Quick
Overall Rating
350
Pipe schematic from manhole 01 0650 to 01 0649
MH: 01 0650MH: 01 0649downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 06500 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area22.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start61.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"77.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"98.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"135.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"166.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"176.9 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"179.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"194.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"206.9 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"217.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"270.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"275.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"309.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"311.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"364.1 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"370.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish372.7 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK372.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0649

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    22.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    22.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    176.9 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    364.1 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

Observations (25)

DistanceCodeObservation
309.3TF
61.9TF
311.3TF
22.6CM
166.3TFC
206.9TFA
364.1TBA
135.7TF
370.1CM
0MGOCONNECTION AT THE MH 3 OC'LOCK
370.1DAGS
194.5TFC
0AMH01 0650
98.1TFA
372.7MGOCONNECTION AT THE MH 3 OC'LOCK
372.9AMH01 0649
176.9TB
77.3TF
217.3TF
275.3TF
0MWL
270.7TF
179.2TF
0MWM
22.6DAGS

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-12-30T03:48:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false