Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2020, 10:24 AM
  • 01 0645_01 0644_5192020_034838.mp4

Date
05/19/2020
W/O
0829299
Weather
Dry
Operator/Surveyor
U-115-06022630
Sewer ID
Z00212
PipeID
P01144
Time
3:24 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1422
Sewer Name
01 MOUNTAIN VIEW-BELLE VERNON TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
20200519VMR_MOUNTAIN_VIEW_BELLE_VERNON_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 0644
Downstream MH
01 0645
Dir. of Survey
Upstream
Length Surveyed
376.7 ft.
Total Length
376.7 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 01 0644 to 01 0645
MH: 01 0644MH: 01 0645upstream0 ft. AMH - Upstream Manhole, Survey Ends - 04:20 AM0.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO, Finish2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: NO, Finish41.5 ft. LFZ - Lining Failure Other, from 08 to 10 o'clock, within 8 inches of joint: NO - patch101.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"103 ft. LFB - Lining Failure Blistered, at 03 o'clock, within 8 inches of joint: NO189 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"196.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"230.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"242.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"274.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"274.9 ft. LFW - Lining Failure Wrinkled, at 12 o'clock, within 8 inches of joint: NO289.3 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"328.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open372.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO, Start372.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: NO, Start373.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"373.6 ft. LFD - Lining Failure Detached, at 02 o'clock, within 8 inches of joint: NO376.7 ft. MWL - Water Level, 10 %of cross sectional area376.7 ft. AMH - Upstream Manhole, Survey Begins - 03:50 am376.7 ft. MWM - Water Mark, 30 %of cross sectional area376.7 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 8"

Observation photos (2)

  • Lining Failure Detached, at 02 o'clock, within 8 inches of joint: NO

    3.1 ft. - Lining Failure Detached, at 02 o'clock, within 8 inches of joint: NO

  • Lining Failure Other, from 08 to 10 o'clock, within 8 inches of joint: NO - patch

    335.2 ft. - Lining Failure Other, from 08 to 10 o'clock, within 8 inches of joint: NO - patch

Observations (23)

DistanceCodeObservation
274.8TF
3.1TFA
187.7TF
146.6TF
0MWL
335.2LFZpatch
0AMH03:50 am
102.4TF
374.6DAGS
374.6DAGS
48.5TFOpen
0MWM
134.1TF
4.1DAGS
87.4TFA
376.7AMH04:20 AM
376TFC
0TFA
101.8LFW
3.1LFD
180.1TF
4.1DAGS
273.7LFB

Properties (6)

custom_field_two
3
customer
LACSD
datetime
2020-05-19T03:24:16-07:00
documentation
REVELES, OLIVER III, CASTILLO, SKINNER
is_lateral_inspection
false
lining
CIPP