C 0392_STACK_11132020_004448.mp4
1 ft. - General Observation - MH RIM SEVERE RUST
2 ft. - General Observation - MH UPPER STACK-BLISTERING PEELING CONCRETE
3 ft. - General Observation - MH CONN IN UPPER STACK SOUTH SIDE
4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - UPPER STACK
5 ft. - General Observation - SOIL VISIBLE VOID ABOVE DOWNSTREAM SOFFIT
6 ft. - General Observation - SOIL VISBLE VOID SOUTHEAST SIDE
7 ft. - General Observation - SOIL VISIBLE VOID SOUTHWEST SIDE
8 ft. - General Observation - SOIL VISBLE AROUND BOTTOM OF STACK
10 ft. - General Observation - SOIL VISIBLE VOID ABOVE DOWSTRAM SOFFIT
11 ft. - General Observation - SOIL VISIBLE ABOVE UPSTREAM SOFFIT
12 ft. - General Observation - DOWNSTREAM VOID
13 ft. - General Observation - UPSTREAM SOIL VISIBLE
| Distance | Code | Observation |
|---|---|---|
| 13 | MGO | UPSTREAM SOIL VISIBLE |
| 2 | MGO | MH UPPER STACK-BLISTERING PEELING CONCRETE |
| 12 | MGO | DOWNSTREAM VOID |
| 0 | MWL | — |
| 0 | MWM | — |
| 5 | MGO | SOIL VISIBLE VOID ABOVE DOWNSTREAM SOFFIT |
| 0 | AMH | 12:35AM |
| 8 | MGO | SOIL VISBLE AROUND BOTTOM OF STACK |
| 4 | SRC | UPPER STACK |
| 11 | MGO | SOIL VISIBLE ABOVE UPSTREAM SOFFIT |
| 6 | MGO | SOIL VISBLE VOID SOUTHEAST SIDE |
| 1 | MGO | MH RIM SEVERE RUST |
| 7 | MGO | SOIL VISIBLE VOID SOUTHWEST SIDE |
| 14 | MSA | STACK INSPECTION COMPLETE (1:25AM) |
| 3 | MGO | MH CONN IN UPPER STACK SOUTH SIDE |
| 10 | MGO | SOIL VISIBLE VOID ABOVE DOWSTRAM SOFFIT |
| 9 | MGO | Conn. @ Mh, 3 O' Clock. Capped |