Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 10:12 AM
  • D 0096_A 1041_01072021_021755.mp4

Date
01/07/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P21855
Time
2:12 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8451
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
D 0096
Downstream MH
A 1041
Dir. of Survey
Downstream
Length Surveyed
21.2 ft.
Total Length
21.2 ft.
Structural Index
3
Structural Quick
5234
Structural Rating
30
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole D 0096 to A 1041
MH: D 0096MH: A 1041downstream0 ft. AMH - Upstream Manhole, Survey Begins - D 00960 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start11.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start21.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish21.2 ft. AMH - Downstream Manhole, Survey Ends - A 104121.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK21.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish21.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    11.9 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (12)

DistanceCodeObservation
21.2SRV
21.2AMHA 1041
0AMHD 0096
21.2MGOCONNECTION AT MH, 9 O'CLOCK
11.9SRV
2.5SAP
0MWM
21.2SSS
0MGOCONNECTION AT MH, 9 O'CLOCK
21.2SAP
2.5SSS
0MWL

Properties (7)

additional_info
630075010521202
custom_field_three
AGGREGATE PROJECTING/SPALLING/REINFORCEMENT VISIBL
custom_field_two
2
customer
1
datetime
2021-01-07T02:12:49-08:00
documentation
PROPIPE
is_lateral_inspection
false