Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2021, 12:07 PM
  • D 0122_D 0121_01042021_042209.mp4

Date
01/04/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10031
Time
4:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8344
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
27 in.
Upstream MH
D 0122
Downstream MH
D 0121
Dir. of Survey
Downstream
Length Surveyed
440.9 ft.
Total Length
440.9 ft.
Structural Index
3
Structural Quick
5O3Q
Structural Rating
850
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
850
Pipe schematic from manhole D 0122 to D 0121
MH: D 0122MH: D 0121downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01222.1 ft. MGO - General Observation - MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start268.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"440.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish440.9 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK440.9 ft. AMH - Downstream Manhole, Survey Ends - D 0121440.9 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK440.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish440.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2.1MGOMAG COAT
440.9MGOCONNECTION AT MH, 3 O'CLOCK
31.5SRV
0MWL
0MGOCONNECTION AT MH, 3 O'CLOCK
440.9AMHD 0121
0MWM
440.6SRV
0AMHD 0122
440.9MGOCONNECTION AT MH, 9 O'CLOCK
440.9SSS
268.2TF
440.9SAP
2.1SSS
2.1SAP

Properties (7)

additional_info
630138010421002
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2021-01-04T04:07:15-08:00
documentation
PROPIPE
is_lateral_inspection
false