Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2021, 09:59 AM
  • D 0115_D 0114_01052021_021705.mp4

Date
01/05/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10023
Time
1:59 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8346
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
REDONDO BEACH
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
30 in.
Upstream MH
D 0115
Downstream MH
D 0114
Dir. of Survey
Downstream
Length Surveyed
538.2 ft.
Total Length
538.2 ft.
Structural Index
3
Structural Quick
5R3T
Structural Rating
1020
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
1020
Pipe schematic from manhole D 0115 to D 0114
MH: D 0115MH: D 0114downstream0 ft. AMH - Upstream Manhole, Survey Begins - D 01150 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COAT51.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start538.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish538.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish538.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish538.2 ft. AMH - Downstream Manhole, Survey Ends - D 0114538.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    51.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0AMHD 0115
538.2SRV
2.5SSS
538.2SSS
538.1SAP
0MWM
0MGOCONNECTION AT MH, 9 O'CLOCK
538.2AMHD 0114
51.4SRV
2.5SAP
0MWL
538.2MGOCONNECTION AT MH, 9 O'CLOCK
2.5MGOMAG COAT

Properties (7)

additional_info
630075010421202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-05T01:59:12-08:00
documentation
PROPIPE
is_lateral_inspection
false