Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 6, 2021, 10:49 AM
  • D 0106_D 0105_01062021_030226.mp4

Date
01/06/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10012
Time
2:49 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8349
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
51 in.
Upstream MH
D 0106
Downstream MH
D 0105
Dir. of Survey
Downstream
Length Surveyed
300.3 ft.
Total Length
300.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole D 0106 to D 0105
MH: D 0106MH: D 0105downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - D 01060 ft. MWL - Water Level, 15 %of cross sectional area2.5 ft. MGO - General Observation - MAG COAT2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start300.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.3 ft. AMH - Downstream Manhole, Survey Ends - D 0105

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
0MGOCONNECTION AT MH, 3 O'CLOCK
0AMHD 0106
0MWL
2.5MGOMAG COAT
2.5SAP
2.5SSS
300.3SAP
300.3SSS
300.3AMHD 0105

Properties (7)

additional_info
630075010521202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-06T02:49:03-08:00
documentation
PROPIPE
is_lateral_inspection
false