Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 06:13 AM
  • D 0103_D 0102_01062021_223021.mp4

Date
01/06/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10009
Time
10:13 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8451
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
57 in.
Upstream MH
D 0103
Downstream MH
D 0102
Dir. of Survey
Downstream
Length Surveyed
536.2 ft.
Total Length
536.2 ft.
Structural Index
3
Structural Quick
5J3T
Structural Rating
805
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
805
Pipe schematic from manhole D 0103 to D 0102
MH: D 0103MH: D 0102downstream0 ft. AMH - Upstream Manhole, Survey Begins - D 01030 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start264 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start536.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish536.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish536.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish536.2 ft. AMH - Downstream Manhole, Survey Ends - D 0102

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    264 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2.4SSS
0AMHD 0103
536.2SRV
536.2SSS
536.2SAP
536.2AMHD 0102
264SRV
2.3SAP
0MWL
0MGOCONNECTION AT MH, 9 O'CLOCK
0MWM
2.3MGOMAG COAT

Properties (7)

additional_info
630075010621202
custom_field_three
AGGREGATE PROJECTING/SPALLING/REINFORCEMENT VISIBL
custom_field_two
2
customer
1
datetime
2021-01-06T22:13:43-08:00
documentation
PROPIPE
is_lateral_inspection
false