Wastewater/Activity/PacpInspection/1.0Jan 7, 2021, 09:46 AM
  • D 0098_D 0097_01072021_020021.mp4

Date
01/07/2021
W/O
865322
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10004
Time
1:46 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8451
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_865322_TV05172_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
57 in.
Upstream MH
D 0098
Downstream MH
D 0097
Dir. of Survey
Downstream
Length Surveyed
340.9 ft.
Total Length
340.9 ft.
Structural Index
3
Structural Quick
5A3M
Structural Rating
390
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
390
Pipe schematic from manhole D 0098 to D 0097
MH: D 0098MH: D 0097downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 00982.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start113.7 ft. TS - Tap Saddle, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.2 ft. TS - Tap Saddle, at 11 o'clock, -, within 8 inches of joint: NO, 6"290.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start340.9 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK340.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340.9 ft. AMH - Downstream Manhole, Survey Ends - D 0097340.9 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK340.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Saddle, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    113.7 ft. - Tap Saddle, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Saddle, at 11 o'clock, -, within 8 inches of joint: NO, 6"

    197.2 ft. - Tap Saddle, at 11 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    290.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

Observations (16)

DistanceCodeObservation
290.4SRV
0MGOCONNECTION AT MH, 9 O'CLOCK
0MGOCONNECTION AT MH, 3 O'CLOCK
0MWL
0MWM
340.9MGOCONNECTION AT MH, 9 O'CLOCK
113.7TS
340.9SSS
197.2TS
340.9AMHD 0097
340.9MGOCONNECTION AT MH, 3 O'CLOCK
2.1SSS
2.1SAP
340.9SAP
0AMHD 0098
340.9SRV

Properties (7)

additional_info
630075010521202
custom_field_three
AGGREGATE PROJECTING/SPALLING/REINFORCEMENT VISIBL
custom_field_two
2
customer
1
datetime
2021-01-07T01:46:54-08:00
documentation
PROPIPE
is_lateral_inspection
false