Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2020, 05:42 AM
  • H 1491_H 1490_12142020_220848.mp4

Date
12/14/2020
W/O
860152
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01206
PipeID
P16451
Time
9:42 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8246
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_860152_TV22148_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 1491
Downstream MH
H 1490
Dir. of Survey
Downstream
Length Surveyed
611.1 ft.
Total Length
611.1 ft.
Structural Index
3
Structural Quick
3X2W
Structural Rating
613
O&M Index
4
O&M Quick
4D00
O&M Rating
100
Overall Index
3
Overall Quick
Overall Rating
713
Pipe schematic from manhole H 1491 to H 1490
MH: H 1491MH: H 1490downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 14910 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start356.9 ft. LR - Alignment Right, 40 %, Start484.3 ft. LR - Alignment Right, 40 %, Finish523.9 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 10"586.4 ft. MWL - Water Level, 45 %of cross sectional area611.1 ft. MSA - Survey Abandoned - CAMERA SCRAPING THE TOP OF PIPE611.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish611.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish611.1 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 40 %, Start

    356.9 ft. - Alignment Right, 40 %, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 10"

    523.9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 10"

  • Survey Abandoned - CAMERA SCRAPING THE TOP OF PIPE

    611.1 ft. - Survey Abandoned - CAMERA SCRAPING THE TOP OF PIPE

  • Water Level, Sag in pipe, 50 %of cross sectional area

    611.1 ft. - Water Level, Sag in pipe, 50 %of cross sectional area

Observations (14)

DistanceCodeObservation
611.1MSACAMERA SCRAPING THE TOP OF PIPE
2SAP
2MGOMAG COAT
611.1SSS
484.3LR
0AMHH 1491
2SSS
0MWM
523.9TB
586.4MWL
356.9LR
611.1SAP
611.1MWLS
0MWL

Properties (6)

custom_field_three
SAG, AGGREGATE PROJECTING, SPALLING
custom_field_two
5
customer
1
datetime
2020-12-14T21:42:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false