Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 22, 2020, 09:38 AM
  • 01 0013_01 0012_12222020_020219.mp4

Date
12/22/2020
W/O
860511
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00209
PipeID
P00677
Time
1:38 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8087
Sewer Name
01 HOOPER AVENUE-COMPTON CREEK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
WO_860511_TV01050_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
15 in.
Upstream MH
01 0013
Downstream MH
01 0012
Dir. of Survey
Downstream
Length Surveyed
748 ft.
Total Length
748 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2]00
O&M Rating
298
Overall Index
2
Overall Quick
Overall Rating
298
Pipe schematic from manhole 01 0013 to 01 0012
MH: 01 0013MH: 01 0012downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 00132 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start745.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish748 ft. MGO - General Observation - ROACHES @ MH748 ft. AMH - Downstream Manhole, Survey Ends - 01 0012

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MWL
0MGOROACHES @ MH
745.3DAGS
2DAGS
0MWM
748MGOROACHES @ MH
748AMH01 0012
0AMH01 0013

Properties (8)

additional_info
630069122120202
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-12-22T01:38:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP