Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2020, 10:46 AM
  • 05 0438_05 0437_12232020_025929.mp4

Date
12/23/2020
W/O
859976
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00499
PipeID
P05636
Time
2:46 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8359
Sewer Name
05 OAK STREET-CENTER AVENUE RELIEF TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
06
Purpose
Routine Assessment
Project
WO_859976_TV05188_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
15 in.
Upstream MH
05 0438
Downstream MH
05 0437
Dir. of Survey
Downstream
Length Surveyed
277.6 ft.
Total Length
277.6 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
270
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
374
Pipe schematic from manhole 05 0438 to 05 0437
MH: 05 0438MH: 05 0437downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 04382 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.2 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start274.1 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Finish274.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish274.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0437277.6 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start

    13.2 ft. - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start

Observations (12)

DistanceCodeObservation
2SAV
274.1OBR
0MWM
277.6AMH05 0437
13.2OBR
2SSS
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
0MWL
274.1SAV
277.6MGOCONNECTION AT MH, 3 O'CLOCK
274.1SSS
0AMH05 0438

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-23T02:46:52-08:00
documentation
PRO PIPE
is_lateral_inspection
false