Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2020, 05:41 AM
  • H 1246_H 1245_12082020_215745.mp4

Date
12/08/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17171
Time
9:41 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8238
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1246
Downstream MH
H 1245
Dir. of Survey
Downstream
Length Surveyed
207.2 ft.
Total Length
207.2 ft.
Structural Index
2
Structural Quick
312G
Structural Rating
85
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
85
Pipe schematic from manhole H 1246 to H 1245
MH: H 1246MH: H 1245downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12462 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT60 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"115.3 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"130.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"163.4 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"205.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish207.2 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK207.2 ft. AMH - Downstream Manhole, Survey Ends - H 1245

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    163.4 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (15)

DistanceCodeObservation
2SAP
2SSS
130.1TF
0MGOCONNECTION AT MH, 9 O'CLOCK
0MWM
205.1SAP
205.1SSS
163.4TBA
207.2MGOCONNECTION AT MH, 3 O'CLOCK
0MWL
60TF
115.3TFA
2MGOMAG COAT
207.2AMHH 1245
0AMHH 1246

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-08T21:41:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false