Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2020, 07:13 AM
  • H 1243_H 1242_12082020_233228.mp4

Date
12/08/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17168
Time
11:13 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8238
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1243
Downstream MH
H 1242
Dir. of Survey
Downstream
Length Surveyed
338 ft.
Total Length
338 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
4
O&M Quick
4200
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
343
Pipe schematic from manhole H 1243 to H 1242
MH: H 1243MH: H 1242downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12432 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.1 ft. LR - Alignment Right, 35 %, Start19.1 ft. LR - Alignment Right, 35 %, Finish61.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"120.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"221.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"323.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"335.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338 ft. AMH - Downstream Manhole, Survey Ends - H 1242

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 35 %, Start

    7.1 ft. - Alignment Right, 35 %, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    61.4 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (15)

DistanceCodeObservation
120.5TF
0MWL
338AMHH 1242
19.1LR
335.6SAP
2SAP
61.4TB
0MWM
2MGOMAG COAT
221.8TF
0AMHH 1243
7.1LR
2SSS
335.6SSS
323.6TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-08T23:13:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false