Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2020, 07:35 AM
  • H 1242_H 1241_12082020_235313.mp4

Date
12/08/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17167
Time
11:35 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8238
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1242
Downstream MH
H 1241
Dir. of Survey
Downstream
Length Surveyed
376.4 ft.
Total Length
376.4 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
2
O&M Quick
2B00
O&M Rating
30
Overall Index
2
Overall Quick
Overall Rating
400
Pipe schematic from manhole H 1242 to H 1241
MH: H 1242MH: H 1241downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12422.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COAT82.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"184.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"285.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"288.1 ft. LL - Alignment Left, 20 %, Start316.1 ft. LL - Alignment Left, 20 %, Finish327 ft. LR - Alignment Right, 20 %, Start373.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish373.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish373.5 ft. LR - Alignment Right, 20 %, Finish376.4 ft. AMH - Downstream Manhole, Survey Ends - H 1241376.4 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.2 ft. - General Observation - MAG COAT

  • Alignment Left, 20 %, Start

    288.1 ft. - Alignment Left, 20 %, Start

  • Alignment Right, 20 %, Start

    327 ft. - Alignment Right, 20 %, Start

Observations (17)

DistanceCodeObservation
82.4TF
327LR
2.2SAP
184.4TF
0MWM
0MWL
373.5SSS
376.4AMHH 1241
2.2SSS
0AMHH 1242
288.1LL
376.4MGOCONNECTION AT MH, 3 O'CLOCK
373.5SAP
316.1LL
2.2MGOMAG COAT
373.5LR
285.8TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-08T23:35:19-08:00
documentation
PRO PIPE
is_lateral_inspection
false