Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2020, 06:47 AM
  • H 1239_H 1238_12092020_230215.mp4

Date
12/09/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17164
Time
10:47 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8239
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1239
Downstream MH
H 1238
Dir. of Survey
Downstream
Length Surveyed
373.8 ft.
Total Length
373.8 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
370
Pipe schematic from manhole H 1239 to H 1238
MH: H 1239MH: H 1238downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12393.1 ft. MGO - General Observation - MAG COAT3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"156 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"250.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"351.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"371.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish373.8 ft. AMH - Downstream Manhole, Survey Ends - H 1238

Observation photos (3)

  • General Observation - MAG COAT

    3.1 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
371.1SSS
54.6TF
0MWL
3.1MGOMAG COAT
0MWM
371.1SAP
3.2SAP
250.3TFC
3.2SSS
156TF
373.8AMHH 1238
351.6TFC
0AMHH 1239

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-09T22:47:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false