Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2020, 10:14 AM
  • H 1273_H 1272_12072020_022714.mp4

Date
12/07/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17198
Time
2:14 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8236
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
VINCENT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
H 1273
Downstream MH
H 1272
Dir. of Survey
Downstream
Length Surveyed
304.2 ft.
Total Length
304.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
2B00
O&M Rating
30
Overall Index
2
Overall Quick
Overall Rating
330
Pipe schematic from manhole H 1273 to H 1272
MH: H 1273MH: H 1272downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 12732 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"11.4 ft. MGO - General Observation - MAG COAT68.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"194.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"227.2 ft. LR - Alignment Right, 20 %, Start300.7 ft. LR - Alignment Right, 20 %, Finish300.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish300.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304.2 ft. AMH - Downstream Manhole, Survey Ends - H 1272304.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    11.4 ft. - General Observation - MAG COAT

  • Alignment Right, 20 %, Start

    227.2 ft. - Alignment Right, 20 %, Start

Observations (16)

DistanceCodeObservation
227.2LR
304.2AMHH 1272
300.7LR
194.2TF
2SSS
0MWM
300.7SAP
7.1TFC
11.4MGOMAG COAT
304.2MGOCONNECTION AT MH, 9 O'CLOCK
0MWL
68.8TF
300.7SSS
2SAP
0MGOCONNECTION AT MH, 9 O'CLOCK
0AMHH 1273

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-07T02:14:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false