Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2020, 11:03 AM
  • H 1270_H 1269_12072020_031650.mp4

Date
12/07/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17195
Time
3:03 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8236
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
VINCENT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1270
Downstream MH
H 1269
Dir. of Survey
Downstream
Length Surveyed
238.3 ft.
Total Length
238.3 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
235
Pipe schematic from manhole H 1270 to H 1269
MH: H 1270MH: H 1269downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12700 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK3.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.5 ft. MGO - General Observation - MAG COAT3.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.5 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"44.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"67.3 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"107.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"130.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"177 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"184.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"231.8 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"238.3 ft. AMH - Downstream Manhole, Survey Ends - H 1269238.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK238.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    3.5 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
130.1TF
3.5SSS
177TF
19.5TFA
107.1TFA
238.3AMHH 1269
231.8TFA
0MWL
0MWM
238.3MGOCONNECTION AT MH, 9 O'CLOCK
0AMHH 1270
3.5MGOMAG COAT
67.3TFA
238.3SSS
238.3SAP
184.8TF
0MGOCONNECTION AT MH, 9 O'CLOCK
3.5SAP
44.2TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-07T03:03:44-08:00
documentation
PRO PIPE
is_lateral_inspection
false