Wastewater/Activity/PacpInspection/1.0Dec 8, 2020, 06:30 AM
  • H 1264_H 1263_12072020_225043.mp4

Date
12/07/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17189
Time
10:30 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8237
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
VINCENT
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1264
Downstream MH
H 1263
Dir. of Survey
Downstream
Length Surveyed
339.7 ft.
Total Length
339.7 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
4
O&M Quick
4600
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
359
Pipe schematic from manhole H 1264 to H 1263
MH: H 1264MH: H 1263downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 12640 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"7.7 ft. LR - Alignment Right, 35 %, Start11 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"18.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"25.5 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"37.7 ft. LR - Alignment Right, 35 %, Finish61.1 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"99.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"107.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"178.2 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"215.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"224.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"273.8 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"338.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.7 ft. AMH - Downstream Manhole, Survey Ends - H 1263

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 35 %, Start

    7.7 ft. - Alignment Right, 35 %, Start

Observations (22)

DistanceCodeObservation
273.8TBA
338.3SSS
2SSS
339.7AMHH 1263
107.2TF
224.6TF
7.7TF
99.5TF
7.7LR
2MGOMAG COAT
61.1TBA
2SAP
25.5TFA
37.7LR
0AMHH 1264
178.2TBA
215.2TF
0MWM
338.3SAP
11TF
18.3TF
0MWL

Properties (6)