Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 8, 2020, 10:54 AM
  • H 1248_H 1247_12082020_031900.mp4

Date
12/08/2020
W/O
859970
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01181
PipeID
P17173
Time
2:54 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8237
Sewer Name
H JOINT OUTFALL H - UNIT 8K
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
25
Purpose
Routine Assessment
Project
WO_859970_TV22032_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1248
Downstream MH
H 1247
Dir. of Survey
Downstream
Length Surveyed
419 ft.
Total Length
419 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
415
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
415
Pipe schematic from manhole H 1248 to H 1247
MH: H 1248MH: H 1247downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 12480 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COAT2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"52 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"59.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"114.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"122.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"169.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"177.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"224.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"232.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"287.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"310.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"388.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"416.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish416.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish419 ft. AMH - Downstream Manhole, Survey Ends - H 1247419 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.4 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
169.6TF
122.3TF
0AMHH 1248
416.1SSS
52TFA
59.9TF
177.8TF
0MWL
310.7TF
4.6TF
287.4TF
2.4SSS
114.9TF
419AMHH 1247
0MWM
232.2TF
2.4MGOMAG COAT
419MGOCONNECTION AT MH, 3 O'CLOCK
388.8TF
224.5TF
2.4SAP
416.1SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-08T02:54:21-08:00
documentation
PRO PIPE
is_lateral_inspection
false