Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2020, 08:43 AM
  • 02 1361_02 1360_12162020_005916.mp4

Date
12/16/2020
W/O
860134
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00277
PipeID
P03884
Time
12:43 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8287
Sewer Name
02 JANE STREET BRANCH TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11A
Purpose
Routine Assessment
Project
RFIR_WO_860134_TV02342_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
02 1360
Downstream MH
02 1361
Dir. of Survey
Upstream
Length Surveyed
269.1 ft.
Total Length
269.1 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
3
Overall Quick
Overall Rating
265
Pipe schematic from manhole 02 1360 to 02 1361
MH: 02 1360MH: 02 1361upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 13611.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE24.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"78.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"108.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"142 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"174.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"231.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"267.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start267.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start269.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE269.1 ft. AMH - Downstream Manhole, Survey Begins - 02 1360269.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK269.1 ft. MWL - Water Level, 25 %of cross sectional area269.1 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    267.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
127.1TFA
0MGOCOCKROACHES IN MANHOLE
190.4TFA
2DAGS
269.1AMH02 1361
160.3TFA
0AMH02 1360
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
244.8TFA
0MWM
267.4DAGS
267.4CM
267.4MGOCOCKROACHES IN MANHOLE
94.9TFA
37.4TF
2CM

Properties (7)

additional_info
630069121520204
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-12-16T00:43:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false