Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2020, 08:15 AM
  • 02 0969_02 0968_12182020_002421.mp4

Date
12/18/2020
W/O
860497
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00279
PipeID
P03539
Time
12:15 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8290
Sewer Name
02 MONTEBELLO TRUNK
City
COMMERCE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Routine Assessment
Project
WO_860497_TV02090_NOV2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
27 in.
Upstream MH
02 0968
Downstream MH
02 0969
Dir. of Survey
Upstream
Length Surveyed
119.2 ft.
Total Length
119.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
322D
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
52
Pipe schematic from manhole 02 0968 to 02 0969
MH: 02 0968MH: 02 0969upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish0 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DUE TO DEBRIS/SLUDGE.10.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE64.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.2 ft. MLC - Lining Change, Cured in place117.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start119.2 ft. MWM - Water Mark, 10 %of cross sectional area119.2 ft. AMH - Downstream Manhole, Survey Begins - 02 0968119.2 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (4)

  • Lining Change, Cured in place

    2 ft. - Lining Change, Cured in place

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE

    108.3 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE

  • Survey Abandoned - DUE TO DEBRIS/SLUDGE.

    119.2 ft. - Survey Abandoned - DUE TO DEBRIS/SLUDGE.

Observations (11)

DistanceCodeObservation
0MWM
119.2DAGS
2MLC
0AMH02 0968
2DAGS
0MWL
119.2DSZ
108.3DSZDEBRIS/SLUDGE
119.2MSADUE TO DEBRIS/SLUDGE.
25.7TF
55.1TFA

Properties (8)

additional_info
630069121720202
custom_field_three
ABANDONED DUE TO DEBRIS/SLUDGE
custom_field_two
5
customer
1
datetime
2020-12-18T00:15:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP