Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2020, 07:42 AM
  • 18 0665_18 0664_12162020_235200.mp4

Date
12/16/2020
W/O
860087
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00696
PipeID
P14514
Time
11:42 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8288
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_860087_TV18081_NOV2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0665
Downstream MH
18 0664
Dir. of Survey
Downstream
Length Surveyed
232.4 ft.
Total Length
232.4 ft.
Structural Index
3
Structural Quick
3E23
Structural Rating
93
O&M Index
2
O&M Quick
2H00
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
183
Pipe schematic from manhole 18 0665 to 18 0664
MH: 18 0665MH: 18 0664downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 06650 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES14.6 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES58.9 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES69.7 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES90.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start132 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"229.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish229.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish232.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0664

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    5.7 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    14.6 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    58.9 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    69.7 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    90.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
5.7CL
232.4AMH18 0664
14.6FL
0AMH18 0665
0MWL
222.7TFC
69.7CL
229.5DAGS
0MWM
2DAGS
229.5CM
132TFC
217.9TFC
90.5CM
58.9CL
137.3TFA

Properties (7)

additional_info
630069121620201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-12-16T23:42:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false