Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2020, 06:20 AM
  • 22 0860_22 0476_12172020_223130.mp4

Date
12/17/2020
W/O
860499
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00803
PipeID
P17227
Time
10:20 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8352
Sewer Name
22 DALTON TRUNK, SECTION 3
City
AZUSA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_860499_TV22083_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0860
Downstream MH
22 0476
Dir. of Survey
Downstream
Length Surveyed
197 ft.
Total Length
197 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
190
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
190
Pipe schematic from manhole 22 0860 to 22 0476
MH: 22 0860MH: 22 0476downstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 08600 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT28.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"84.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"140.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"179.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"194.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish197 ft. AMH - Downstream Manhole, Survey Ends - 22 0476

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (14)

DistanceCodeObservation
28.9TFC
197AMH22 0476
194.3SSS
194.3SAP
2SSS
0MGOCONNECTION AT MH, 3 O'CLOCK
140.1TFC
2SAP
2MGOMAG COAT
84.9TFC
0MWM
179.9TFC
0AMH22 0860
0MWL

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-17T22:20:22-08:00
documentation
PRO PIPE
is_lateral_inspection
false