H 1481_H 1480_12152020_015802.mp4
2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.4 ft. - General Observation - MAG COAT
2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
41.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
357.8 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
462.2 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 357.8 | TB | — |
| 0 | AMH | H 1481 |
| 41.9 | TB | — |
| 2.4 | SSS | — |
| 462.2 | TB | — |
| 527 | SSS | — |
| 0 | MWL | — |
| 2.4 | MGO | MAG COAT |
| 528.8 | AMH | H 1480 |
| 527 | SAP | — |
| 2.4 | SAP | — |