H 1480_H 1479_12152020_214323.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COAT
55.7 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8", 8"
110.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
205.7 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"
253.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
360 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
408 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"
458.4 ft. - Alignment Right, 40 %, Start
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | — |
| 0 | MWM | — |
| 458.4 | LR | — |
| 205.7 | TBA | — |
| 408 | TB | — |
| 531.7 | LR | — |
| 110.5 | TB | — |
| 55.7 | TB | — |
| 534.5 | AMH | H 1479 |
| 2 | SAP | — |
| 531.7 | SSS | — |
| 360 | TB | — |
| 2 | MGO | MAG COAT |
| 253.2 | TB | — |
| 531.7 | SAP | — |
| 0 | AMH | H 1480 |
| 0 | MWL | — |