H 1479_H 1478_12152020_224323.mp4
2 ft. - General Observation - MAG COAT
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
145.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
225.8 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
319 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"
400.9 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
534.7 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
615.4 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"
648 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"
678.1 ft. - Alignment Left, 50 %, Start
| Distance | Code | Observation |
|---|---|---|
| 225.8 | TB | — |
| 615.4 | TB | — |
| 758.8 | SSS | — |
| 145.5 | TB | — |
| 758.8 | SAP | — |
| 758.8 | LL | — |
| 760.9 | AMH | H 1478 |
| 0 | MWM | — |
| 678.1 | LL | — |
| 2 | MGO | MAG COAT |
| 0 | MWL | — |
| 2 | SAP | — |
| 2 | SSS | — |
| 648 | TB | — |
| 534.7 | TB | — |
| 0 | AMH | H 1479 |
| 319 | TB | — |
| 400.9 | TB | — |