Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2020, 09:52 AM
  • H 1513_H 1511_12102020_020335.mp4

Date
12/10/2020
W/O
859968
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01206
PipeID
P16472
Time
1:52 AM
Certificate
U-11506022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8241
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_859968_TV22094_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1513
Downstream MH
H 1511
Dir. of Survey
Downstream
Length Surveyed
364.7 ft.
Total Length
364.7 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
360
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
360
Pipe schematic from manhole H 1513 to H 1511
MH: H 1513MH: H 1511downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 15130 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK3.6 ft. MGO - General Observation - MAG COAT3.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start361.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish361.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.7 ft. AMH - Downstream Manhole, Survey Ends - H 1511

Observation photos (3)

  • General Observation - MAG COAT

    3.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
364.7AMHH 1511
3.6MGOMAG COAT
3.6SAP
361.6SAP
3.7SSS
0MWL
361.6SSS
0MWM
0AMHH 1513
0MGOCONNECTION AT MH, 3 O'CLOCK

Properties (7)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-10T01:52:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30047