Wastewater/Activity/PacpInspection/1.0Dec 14, 2020, 08:56 AM
  • H 1500_H 1499_12142020_011942.mp4

Date
12/14/2020
W/O
859968
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01206
PipeID
P16460
Time
12:56 AM
Certificate
U-11506022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8243
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_859968_TV22094_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
H 1500
Downstream MH
H 1499
Dir. of Survey
Downstream
Length Surveyed
299.3 ft.
Total Length
299.3 ft.
Structural Index
3
Structural Quick
3K21
Structural Rating
176
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
176
Pipe schematic from manhole H 1500 to H 1499
MH: H 1500MH: H 1499downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 15000 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT8.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start297.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish297.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish297.5 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK299.3 ft. AMH - Downstream Manhole, Survey Ends - H 1499

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
297.5MGOCONNECTION AT MH, 3 O'CLOCK
299.3AMHH 1499
8.1SAP
2SSS
2MGOMAG COAT
297.4SSS
0MWL
297.3SAP
0AMHH 1500
0MWM

Properties (7)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-14T00:56:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30047