Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2020, 07:59 AM
  • H 1488_H 1487_12152020_002419.mp4

Date
12/14/2020
W/O
859968
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01206
PipeID
P16448
Time
11:59 PM
Certificate
U-11506022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8247
Sewer Name
H JOINT OUTFALL H - UNIT 8M RELIEF
City
WEST COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_859968_TV22094_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
H 1488
Downstream MH
H 1487
Dir. of Survey
Downstream
Length Surveyed
704.4 ft.
Total Length
704.4 ft.
Structural Index
3
Structural Quick
3[2[
Structural Rating
700
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
700
Pipe schematic from manhole H 1488 to H 1487
MH: H 1488MH: H 1487downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 14880 ft. MWL - Water Level, 25 %of cross sectional area2.8 ft. MGO - General Observation - MAG COAT2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start391.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"702.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish702.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish704.4 ft. AMH - Downstream Manhole, Survey Ends - H 1487

Observation photos (3)

  • General Observation - MAG COAT

    2.8 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
704.4AMHH 1487
0AMHH 1488
702.5SSS
391.5TF
2.9SAP
0MWL
2.8MGOMAG COAT
3SSS
702.5SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-12-14T23:59:21-08:00
documentation
PRO PIPE
is_lateral_inspection
false