03 0413_03 0412_12152020_001208.mp4
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
43.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERAL DEPOSITS
197.4 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start
233.4 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start
237.3 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES
245.4 ft. - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 148 | TFC | — |
| 197.4 | FL | — |
| 297.2 | DAGS | — |
| 2 | SSS | — |
| 0 | MWL | — |
| 208.7 | FL | — |
| 0 | MWM | — |
| 233.4 | FL | — |
| 299.7 | AMH | 03 0412 |
| 297.2 | FL | — |
| 43.7 | DAE | MINERAL DEPOSITS |
| 297 | SSS | — |
| 0 | AMH | 03 0413 |
| 153.1 | TB | OPEN |
| 245.4 | FM | — |
| 2 | DAGS | — |
| 299 | MGO | CONN @ MH 9 O'CLOCK/CAPPED |
| 237.3 | FS | — |
| 297.2 | DAE | — |