Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2020, 06:28 AM
  • 14 0505A_14 0505_12092020_224220.mp4

Date
12/09/2020
W/O
860099
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18595
Time
10:28 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8271
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_860099_TV14021_NOV2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0505A
Downstream MH
14 0505
Dir. of Survey
Downstream
Length Surveyed
307.2 ft.
Total Length
307.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
422K
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
435
Pipe schematic from manhole 14 0505A to 14 0505
MH: 14 0505AMH: 14 0505downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0505A2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 85% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start18.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"120.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"145.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"192.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"217.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"291 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"305.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish305.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish305.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish307.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0505307.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
2SSS
307.2AMH14 0505
120.2TFC
0MWM
2MGO85% MAG COAT
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
217.8TFC
0MWL
291TFC
305.6DAGS
2SAP
145.2TFC
169.1TFC
192.8TFC
71.1TFC
305.6SAP
2DAGS
305.6SSS
266.3TFC
95.6TFC
307.2MGOCONNECTION AT MH 9 O'CLOCK/ACTIVE
242TFC
18.8TFC
0AMH14 0505A

Properties (7)

additional_info
630069120920201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-12-09T22:28:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false