Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2020, 11:11 AM
  • 22 0100_22 0099_12042020_032737.mp4

Date
12/04/2020
W/O
860500
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00805
PipeID
P16341
Time
3:11 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8235
Sewer Name
22 DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_860500_TV22092_NOV2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
22 0100
Downstream MH
22 0099
Dir. of Survey
Downstream
Length Surveyed
268.8 ft.
Total Length
268.8 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
260
Pipe schematic from manhole 22 0100 to 22 0099
MH: 22 0100MH: 22 0099downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 01000 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SLIGHT SPALLING THROUGHOUT7.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"91 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"114.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"184.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"206.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"216.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"265 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish266.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish268.8 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK268.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0099

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    91 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (17)

DistanceCodeObservation
216.1TFC
266.3SAP
3SSSSLIGHT SPALLING THROUGHOUT
91TB
265SSS
67.6TFC
0MWL
2MGOMAG COAT
184.7TFC
7.1SAP
0MGOCONNECTION AT MH, 3 O'CLOCK
0AMH22 0100
268.8MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
206.9TFC
268.8AMH22 0099
0MWM
114.4TFC

Properties (7)

additional_info
630138120320205
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-04T03:11:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false